References

UK References

Royal London Hospital

First bed TWIN systems worldwide

42 elevators
20 floors
There of 5 TWIN systems with 10 cabins in total including 3 bed TWIN systems with 2,500 kg load capacity
Speed: 2.5 m/s
Completion: 2012
 

London Wall, London

Building height: 82 m
18 floors
10 elevators with Destination Selection Control
11 freight and fire elevators
Maximum elevator speed: 5 m/s
6 escalators

 

Project Bodongo , Edinburgh Zoo

New Primate Interactive Centre.

1 - 1250 "Soft Land"
Passenger Lift - Univers
2 stop through car
Speed: 1mps
 

Usher Hall Redevelopment - Phase 1

 1  "special" with 1600kg load capacity
Specially lined car - 4 stop through car
Speed: 1mps
Work to commence: Later this year

 

Exchange Place , Edinburgh

11 lifts - Univers
7 with 1000kg  load capacity
2 with 630kg load capacity -fire fighting lifts
1 with 1600kg load capacity -goods lifts.
Speed:  1.6mps
All serving 7 floors
All stainless stell finish

 

Bankside, London

8 scenic elevators for the Bankside development.
Comprises of 229 luxury apartments split over 4 C
boat - shaped blocks ranging up to 24 storeys.
 
1000kg lift capacity /13 persons serving
12, 18 & 24 storeys at speeds 1.6m/s and 2.0m/s
Completion: June 2011
 

Consort House, Aberdeen

3 passenger lifts with 1000kg capacity - Univers stainless steel
1 goods lift with 1600kg capacity - Univers stainless steel
Serving 7 floors
Speed: 1mps

 

Union Row Offices, Aberdeen

 6 Univers lifts- 9 Stop car
5 passenger lifts with 1000kg capacity (2 x fire fighting)
1 Goods lift with 1600kg capacity
Speed: 1.6mps
All stainless steel except passenger lifts 1,2,3 which were Soft Land finish

 

Glasgow Schools

11 ISIS lifts
630kg units,
All 2 stop cars
Speed: All 1mps
All stainless
2  Synergy lifts for stage 2 so far.
Complete works contract won by TKE

 

HMP Lowdham Grange

Currently in process of arranging 3 Synergy lifts
Due to commence: July 2009
Completion intended: Early September 2009

 